About Astilleros de Mallorca About Astilleros de Mallorca

Sign up to our newsletter


In 2025, Astilleros de Mallorca SA completed its second photovoltaic installation project, which included roof replacement and asbestos removal, with an investment of €390,111.62. The project aimed to reduce energy consumption, CO2 emissions, and eliminate hazardous materials. The 215 kW photovoltaic installation consists of 392 panels with a total peak power of 258.72 kWp. 2,116 m² of asbestos cement roofing were removed and replaced with sandwich panels.

This project was financed with support from the European Union's Recovery, Transformation and Resilience Facility, specifically the Balearic Islands Energy Transition Investment Plan (PITEIB). A grant of €190,003.97 was awarded.

logos banner
Privacy Policy

More information about our Privacy Policy

Cookie moove_gdpr_popup

This cookie is strictly necessary.
Strictly Necessary cookies help make a website usable by enabling basic functions like page navigation and access to secure areas of the website. The website cannot function properly without these cookies and cannot be disabled.