Our Refit

PROCESS FLOW

Our long-standing experience on new builds and refits assures the quality expected on a superyacht refit, but it is our flexibility, transparency, and client orientation where we have distinguished ourselves in the market.

FROM CONCEPT TO DETAIL


I

    phase 1 – concept

    We offer this scope free of charge, without compromise. The aesthetical concept is defined with basic renders, and the project´s viability from the Rules and Regulations point of view is checked. The input we require from you is the General Arrangement, Hull/Superstructure Lines Plan, and Typical Sections drawing. This Phase already allows us to give you a ballpark figure of the whole Refit.

    II

      phase 2 – functional design

      We develop renders of all the surfaces, although not including the outfitting details yet. The relevant drawings for classification approval are executed. This Phase allows us to prepare a more detailed quotation.

      III

        phase 3 – detailed design

        3D scans of the actual surfaces on board.
        Full detail Renders.
        Construction drawings. Final Quotation for the Refit.

        SERVICE ROLES

        Our flexibility is also present in the range of service roles we can offer to our clients, depending where we are delivering the service.

        At ‘STP Open Access Site’ five different options are possible:

        Our facilities allow us to undertake any refit, conversion, repair or maintenance work that a yacht up to 70m on the slip or LOA 110m might need.

        Main Contractor

        • A team of Project Managers & Technical Supervisors is assigned to the vessel and lead the project through all phases.
        • TPA Management.
        • € 30.000.000 Ship Repair liability insurance.
        • Full responsibility & warranty of all works performed onboard.
        • Health, Safety & Environmental matters Responsibility & Coordination according to Spanish Law.
        • Tax & Legal Advice.
        • ICOMIA Contract Terms.

        The vessel assumes the role of Main Contractor being fully responsible for the works performed.

        Project Manager

        • Coordinating all works to be done by AdM and the other subcontractors.

        The vessel assumes the role of Main Contractor being fully responsible for the works performed and the coordination of the subcontractors.

        Subcontractor

        • AdM is subcontracted by the Vessel to execute certain works.

        The vessel assumes the role of Main Contractor being fully responsible for the works performed and the coordination of the subcontractors.

        TPA Agent

        • AdM is contracted by the Vessel acting as a TPA agent.

        The vessel assumes the role of Main Contractor being fully responsible for the works performed and the coordination of the subcontractors.

        TPA Agent & Project Consultant

        • TPA processing.
        • Haul out & mooring assistance in STP.
        • Subcontractor’s guidance.
        • Planning assistance.
        • Technical advice.
        • Tax & Legal Advice.
        • Financial coverage for suppliers up to 50.000€ & 1 week delay.


        * TPA – Inward Processing